Skip to content

Release Notes

🆕 TaskView 1.15 — Release Notes

New:

  • Added ability to display tasks as graphs — now you can visualize task connections and project structure.
  • Save positions of elements in the graph for consistent layouts.
  • Create linked tasks by dragging an edge and dropping it in free space.
  • Added option to switch between vertical and horizontal graph layouts.
  • Added ability to delete connections between tasks.

Improvements:

  • Removed list item animations to improve performance on low-end devices.

Fixes:

  • Fixed TLS configuration issue for SMTP connections.

Blog post is here